Flatbed & heavy haul
Heavy, long, awkward — and still on time
Pipe racks, skid packages, vessels, structural steel and rig equipment: the freight that damages easily, loads slowly and cannot be reworked if the trailer shows up wrong.
Houston, TX · USDOT 1895894
Equipment
Trailers on the board
- 01
48 & 53 ft flatbed
Standard deck work: pipe, plate, bundled steel, and palletized or crated industrial freight.
- 02
Step deck
For loads that will not clear legal height on a flat deck — tanks, skids and taller fabrications.
- 03
RGN and heavy specialty
Placed through our brokerage with heavy-haul partners we have used for years, with permits and escorts arranged.
How it works
Planned before the truck is dispatched
- 01
Technical details
Dimensions, weight, center of gravity, lift points, and origin and destination access.
- 02
Requirements review
Equipment selection, securement plan, permits, routing and escort needs.
- 03
Operating plan and execution
Confirmed load and unload method, agreed schedule and documented delivery.
Before we quote
What we confirm on every open-deck load
| Requirement | What to confirm before quoting |
|---|---|
| Dimensions | Length, width, height and how the piece sits on the deck |
| Weight | Gross weight and weight distribution |
| Lifting | Lift points, rigging requirements, crane or forklift at both ends |
| Site access | Gate size, turning radius, overhead clearance and ground conditions |
| Permits | State permits, routing restrictions, escort requirements and travel hours |
| Securement | Tarping, blocking, bracing, chains and dunnage |
Securement
Securement is where carriers get caught
Most damage claims on industrial freight start at the load, not on the road. Our drivers load to the commodity, not to habit.
- Chain, binders, straps and edge protection matched to the commodity
- Coil racks, pipe stakes and dunnage carried as standard, not requested
- Tarping for weather-sensitive machined surfaces and coated pipe
- Photo documentation at load and at delivery
- Weight distribution checked against axle limits before the truck rolls
- Oversize permits and route surveys handled ahead of dispatch
Commodities
What rides on our decks
- Line pipe, casing and tubing
- Pressure vessels and separators
- Pump and compressor skids
- Valves, BOP components and wellheads
- Structural steel and pipe spools
- Mud pumps and drilling equipment
- Frac and completion tooling
- Crated export machinery
- Plant turnaround materials
Who it is for
Freight that does not fit a standard trailer or process
Equipment manufacturers, fabricators, energy operations and project customers. Open-deck freight often needs somewhere to go before or after the truck: staged before the site is ready, repacked before it ships, held between fabrication and installation. Lightning can handle all of it on one account.
It is not for requirements outside verified Lightning capability. If a move needs equipment or permitting we cannot execute safely, we will say so.
- Pressure-vessel and structural fabricators
- Equipment OEMs and packagers
- Energy and petrochemical operations
- EPC and capital project teams
Questions
Flatbed questions
Do you handle permits for oversize loads?
Yes. Texas and neighboring-state permitting, route surveys and escort coordination are arranged before dispatch. We will tell you up front when a load’s dimensions push the delivery window.
Can you provide proof of insurance?
Yes. Insurance certificates are available on request and issued to your contract requirements; see our Safety & Compliance page for details.
Can you load at our fab shop with our crane?
Yes, and we will schedule the truck to your crane window instead of asking your crew to work around ours.
Can you crate or brace the freight before it ships?
Yes. Crating, blocking and bracing are available through Rapid Crate Solutions and coordinated with the transport plan.
Related
- ServiceIndustrial CratingMost shippers move freight to a crating vendor, wait, then move it again. Rapid Crate Solutions builds inside the Lightning warehouse, so packaging happens between the dock door and the deck.
- ServiceProject LogisticsCapital equipment, shutdowns, multiple shipments and changing schedules coordinated on one operating plan — transportation, storage, handling, scheduling and communication around the move.
- IndustryManufacturing & FabricationKeep inbound material, outbound equipment, production schedules and customer deliveries aligned when freight requirements change.
- CompanySafety & ComplianceWhen a carrier’s authority lapses or a safety rating slips, it can create problems for the shipper, too. This page exists so the person vetting us can finish in ten minutes instead of ten emails.
Need a truck now — or a logistics plan for what comes next?
Tell us what is moving, where it needs to go, when it needs to arrive and what constraints matter. Lightning will help identify the transportation and logistics plan that keeps the shipment, and the operation around it, moving.
