Services
Everything the load needs, from one team
A pipe skid that ships Tuesday may need a flatbed, a week of warehouse space, an export crate and a drayage move from the port. Most buyers coordinate three vendors to make that happen. Here it is one account and one dispatcher.
Houston, TX · USDOT 1895894
- Operating since
- 2009
- Houston warehousing
- 52,000 sq ft
- Transportation authority
- 48-state
- Capacity model
- Asset + brokerage
- Dispatch
- 24/7
How services connect
One operating group behind every move
Lightning does not hand your freight to a different department for each step. The same dispatch, warehouse and account people run the transportation, the storage, the staging and the coordination — which is why the schedule survives when one piece of it changes.
- Asset-based Houston fleet, pickups through tractor-trailers
- In-house brokerage for capacity, geography and equipment gaps
- 52,000 sq ft warehouse for storage, staging and freight handling
- Industrial packaging coordinated through Rapid Crate Solutions
Service lines
Start with the requirement
Tell us what has to happen to the freight. We will match the equipment, capacity, warehouse and handling behind it.
- 01
Hot shot & expedited
Pickups, gooseneck and dually trailers dispatched out of Houston for parts that have to move today.
Get critical freight moving - 02
Flatbed & heavy haul
Flatbed, step deck, RGN and oversize moves for pipe, skids, vessels and rig equipment.
Specialized transport - 03
Freight brokerage
FTL, LTL and vetted nationwide capacity behind our own fleet, so a full asset board never turns into a no.
Find capacity - 04
Port drayage
Barbours Cut, Bayport and Ship Channel container moves with TWIC-credentialed drivers.
Port drayage - 05
Project logistics
Capital equipment, shutdowns, multiple shipments and changing schedules coordinated on one operating plan.
Discuss project logistics - 06
Industrial crating
Crating, blocking and bracing and ISPM-15 export packaging through Rapid Crate Solutions, coordinated with the truck.
Coordinate crating
The lowest transportation rate does not always produce the lowest operational cost.
Why the bundle matters
One vessel, four services, one account team
Take a fabricator shipping a vessel to a Permian site, with a two-week gap between fab completion and site readiness.
- 01
Pick up at the shop
A flatbed pulls the vessel the day it clears QC, so the fab floor is not storing it.
- 02
Stage in our warehouse
Two weeks under roof near the Ship Channel instead of blocking the customer’s yard.
- 03
Crate what ships abroad
Rapid Crate Solutions builds ISPM-15 export packaging on site. No second freight move to a crating vendor.
- 04
Deliver on the site’s window
Same account team, same dispatcher, one schedule covering all of it.
Related
- WarehousingWarehousingFab shops run out of yard. Projects slip and material has to land somewhere. Our warehouse takes the freight so your floor stays clear, and our trucks are ready when the site is.
- CompanyWhy LightningEveryone in this category says the same five things. Below are the parts of our operation that can be checked, put in writing or handed to your boss.
- ServiceRequest a TruckQuotes typically return within one business hour on standard lanes. If the freight moves today, call dispatch instead — a form is slower than a phone.
- CompanyHouston Industrial LogisticsOne terminal, one warehouse, one dispatch group. Freight originates here and moves to wherever the operation needs it.
Need a truck now — or a logistics plan for what comes next?
Tell us what is moving, where it needs to go, when it needs to arrive and what constraints matter. Lightning will help identify the transportation and logistics plan that keeps the shipment, and the operation around it, moving.
